ASSET_CALENDAR_BUILD_INDEX_DURATION
Product
Civic Platform
Type
System Switch
Description
This Standard Choice defines the start date and end date of a duration. When you run a batch job whose type is Asset Calendar Rebuild Index, the batch job only builds indexes for the asset events whose event time (for example, event schedule time) falls in the duration.
Standard Choice Values | Value Description | Description |
---|---|---|
END DATE | Enter a date with this format: MM/dd/yyyy. For example: 01/01/2017 | Enter the end date of the duration. If you do not specify the end date, the end date defaults to the latest event date. |
START DATE | Enter a date with this format: MM/dd/yyyy. For example: 12/31/2016 | Enter the start date of the duration. If you do not specify the start date, the start date defaults to the earliest event date. |