Description

This Standard Choice defines the start date and end date of a duration. When you run a batch job whose type is Asset Calendar Rebuild Index, the batch job only builds indexes for the asset events whose event time (for example, event schedule time) falls in the duration.

Table 1. ASSET_CALENDAR_BUILD_INDEX_DURATION Standard Choice Values
Standard Choice Values Value Description Description
END DATE Enter a date with this format: MM/dd/yyyy. For example: 01/01/2017 Enter the end date of the duration.

If you do not specify the end date, the end date defaults to the latest event date.

START DATE Enter a date with this format: MM/dd/yyyy. For example: 12/31/2016 Enter the start date of the duration.